武汉腾讯研发中心 | GN

1 (2).jpg2.jpg3 (1).jpg3 (2).jpg


与中国其他经济开发区一样,在亚洲最大的城中湖——汤逊湖所在的武汉江夏区,正进入快速发展期,几年时间将会从乡村变成产业园,再变成城市。而作为湖边的第一个办公建筑,设计如何--解决和缓解快速的需求迭代及冲突,是我们要考虑的第一问题。


Wuhan Jiangxia District, where Tangxun Lake, the largest urban lake in Asia is located, is entering a period of rapid development. In a few years, it will turn from a village to an industrial park and eventually into an urban area. The main task of our project is to solve and alleviate the conflicts caused by the rapid iteration of demands through the design.


设计项目7.5万方,共五层,通过三次转折完成了平面塑造。建筑沿着湖面线性折展,产生更多的湖景可视角度。我们将每个平层办公区放到最大,以多条竖向交通核支撑起,这样的沟通和协作效率最高,空间使用的集约性和弹性也很好。一层公共服务区,有展厅、QQ商店、咖啡厅。将印刷玻璃作为基底,像湖面晨雾那样有白色漂浮的姿态,和场地环境的对话也很好。二层以上为办公区。沿着湖面用隔层大露台和大台阶连接湖岸,可以是午间休憩和夜晚派对的地方,也可以从办公室直接走到湖边树林里工作。


To get more viewable angles of lake scenery, the five-story building is expanding along the lake. On each floor, maximized office area is supported by multiple vertical traffic cores. In this way, efficient communication and collaboration are achieved. Office area ranges from the second to the fifth floor. An expansive interlayer terrace with large steps connects with the lakeside, which provides a place for lunch breaks and night parties. From the office, the employees can also walk directly to the forest near the lake.


4 (1).jpg4 (2).jpg

4 (3).jpg


沿着城市界面用深色大墙面做出干净的削切体型,这种关系一直延伸到屋面,再折到临湖面的墙体。顶部削切起伏延续了墙面做法,消隐掉了屋顶设备。从湖边高层望向汤逊湖时候,你会看见一个干净利落的中景,所有变化都收拢在散着金属光泽的深灰色体块转折中。为了打开主入口通向湖面视线,我们设计了10X30M尺寸的建筑架空,形成湖景景框。由一条水带将入口引向湖面,这是将汤逊湖和城市连接在一起的轴线。场地景观也沿着这条水带展开,这个设定的视框轴线是汤逊湖很美的角度,我们希望客人在进入场地后,站在大悬挑的斜墙下,可以看见远处的大桥,又能吹拂到湖面来的湿湿的风。


A neatly cut shape is formed of dark large walls along the urban interface, extending to the roof and then folding toward the wall facing the lake. The wall handling is continued in the cuts and undulations of the building’s top, and roofing equipment is hidden from sight. Looking over from the high-rise, people can have a panoramic view, with all the changes gathered in a dark gray block with metallic luster. To widen the view to the lake from the main entrance, an elevated ground level with 10×30M sized is designed to form a frame of the lake view. A water belt leads the entrance to the lake, functioning as an axis that connects the lake with the city.


从设计到建成有7年时间,开业后,因为一些市场策略调整,武汉的办公入住人员先只用一层,其他空间出租作为腾讯众创办公,经营逻辑的变化使很多初时的设想变得冗余,庆幸是绝大部分的宽容度足够,也能自如应对当前变化。


From the phase of design to completion of construction, the process lasted for 7 years. After the opening, only one floor of the building is available for office tenants from Wuhan due to some adjustments in marketing strategy. And the rest space is rented as Tencent's co-working office. Some of the initial design ideas became redundant due to the transformation of business logic, but fortunately, the design is still flexible enough to tackle the current changes.


5 (1).jpg5 (2).jpg5 (3).jpg6 (1).jpg


业主: 腾讯科技(武汉)有限公司

面积: 75000 m²

摄影师:章勇

合作方: 筑博设计(集团)股份有限公司

品牌: 施耐德电气、蒂森电梯、索恩照明


来自(SEE MORE)    GN

下一篇:这是最后一篇
上一篇:这是第一篇
写下您的评论吧